KentixONE Maintenance
System Data
Operator/Project: _________________________________
Location(s): _________________________________
Responsible persons: _________________________________
Date: _________________________________
Version: _________________________________
Notes: _________________________________
Preparations
- Roles & responsibilities clarified:
- Operator provides access, names responsible persons, documents deficiencies/approvals
- Service technician/Kentix partner performs maintenance, creates test protocols, recommends improvements
- IT/Network operations: Backups, updates, ports/redundancy, system maintenance
- Safety & work equipment available:
- PPE/ladder according to object, lint-free cloths, no aggressive solvents
- Notebook/tablet with admin access to KentixONE web frontend/app
- Test RFID/token, door opener test tool
- Test aerosol/gas according to manufacturer approval or tested functions
- Multimeter/network tester, PoE tester if needed
- System access & data:
- Admin access, passwords, IP plan known
- Escalation contacts, service hours, control center parameters available
- Time/NTP server, email/SMTP, VDS/LDAP/cloud access if applicable
Steps - Full Maintenance (Annual)
1. System Platform (KentixONE / SiteManager / Docker)
- Check and update firmware/software versions (central unit, device FW)
- Backups checked: successful jobs present; recovery test documented
- SD/storage checked (errors, wearout)
- Time, timezone, NTP sync correct (alarm/video correlation)
- Interfaces & ports tested: HTTPS, SNMP, app/push, email, SMS, VDS2465
- Mobile network fallback (if present) simulated
- User/role review: least privilege, remove inactive accounts, 2FA if used checked
- Visual inspection: sensors, controllers, cameras, network equipment for damage/contamination/manipulation
2. Alerting & Notification Paths (Alarm Monitoring)
- End-to-end test: Trigger sensor/event → Verify entry in KentixONE → Check notification (app/email/SMS) (timestamp, content)
- Alarm texts/escalation chains: Contacts, service hours, levels validated
3. Access Control (SmartAccess)
- Reader/mechatronics: Mechanics, mounting, seals, battery status
- Mechanical components: Door locks, fittings, motor locks checked
- Function test: Test RFID, permissions/time profiles, door/bolt contacts, release times; door opener triggered
- Event logs traceable (who-when-where access?)
4. Intrusion Detection Functions
- PIR/motion detectors: Walk test with path; masking/pets considered
- Tamper contacts: Tear-off/housing contacts tested; alert pattern correct
- Armed/disarmed: Schedules, coupling with access (area arming) verified
- Alarm transmission: Control center connection/notification chain tested (VDS2465/email/app/SMS)
5. Video Surveillance (SmartVideo)
- Camera health: PoE/voltage, bitrate, resolution, time sync
- Event-based recording: Alarm-synchronized clips present; playback/export tested
- Storage: Fill level and retention checked
- Field of view/privacy: Glare, backlight, focus; privacy masks/data protection notices OK
6. Early Fire Detection (SmartMonitoring/MultiSensor)
- Sensors cleaned dust-free; suction areas clear
- Function test with permitted test methods (no unauthorized aerosol)
- Response thresholds/alarm classes according to concept
- Pre-/main alarm, acknowledgment, escalation checked
7. Environmental Monitoring
- Measurement channels: Temperature, RH, dew point, air quality, vibration - plausibility check
- Calibration intervals maintained according to use case
- Thresholds/hysteresis vs. operating limits checked (DC, IT room, warehouse, office)
- Leakage zones: Sensor position, cable sensor routes; test via contact moisture (if present)
- Sensor placement: free from obstacles and disturbing heat/cold sources
8. Network Monitoring
- SNMP/ICMP targets reachable; service checks (HTTP/VPN/DB) as defined
- Threshold values/escalations: Latency/packet loss triggers checked; notifications verified
9. PDU/Energy Monitoring (SmartPDU)
- Load/phase balance checked; overload/overtemperature alarms simulated; measurements logged
- UPS integration: Status, remaining runtime, battery test; alarm forwarding checked
- Electrical test intervals according to DGUV V3 considered
Monthly Quick Checks (Excerpt)
- Dashboard "red/yellow" = 0: All faults resolved
- Alarm paths OK: App push & email test message
- 2 doors randomly: Access + door contacts
- 1 camera/location: Live image + clip export
- 2 MultiSensors: Quick self-test/trend values plausible
- PDU/UPS: View event log; limits appropriate
Acceptance Criteria (Pass/Fail)
- No open "critical" faults after maintenance
- All eight functional areas successfully tested and documented
- Time server synchronized; backup tested; alarm paths E2E checked
- Logs/events complete, exportable; data protection fulfilled
- Action list with responsible persons/deadlines created
Documentation (Template)
- System data sheet (locations, device IDs, FW versions)
- Checklists/protocols per functional area incl. measurement/test values
- Deficiencies & measures (priority, deadline, responsible person)
- Change record (profiles, thresholds, users)
- Photo documentation (sensor positions, door components, camera fields of view)
Appendix (to be filled in)
Alarm Test (Sample Protocol)
Test | Trigger | Expectation | Result | Time | OK |
---|---|---|---|---|---|
Alarm path app/email | Sensor event | Alarm + notification | |||
VDS2465 | Test alarm | Control center message | |||
Tamper contact | Tear-off/housing contact | Alarm + escalation | |||
Access | RFID access | Authorized → Release | |||
Video | Alarm-synchronized clip | Playback/export possible | |||
MultiSensor early warning | Permitted test (manufacturer note) | Pre-alarm/main alarm correct | |||
PDU/UPS | Overload/overtemp./battery test | Alarm forwarding |